Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13629353

- Product Categories
- Friendly Links
Information Name: | Supply factory direct CGM clay track, Shandong Province |
Published: | 2015-03-22 |
Validity: | 30 |
Specifications: | 50KG / bag |
Quantity: | 9999999999.00 |
Price Description: | |
Detailed Product Description: | CGM CGM clay track is a track containing a selection of natural clay aggregate, with excellent fluidity, high compressive strength, longer working hours, economy, dense, non-shrink, no rust, no metal aggregates, construction convenient, continued to improve, good adhesion properties and toughness grout dedicated track clay a range of applications ports, docks crane rail slot. (For rail clips grout, floor bolts, etc.) of various machinery and equipment installation, steel support base, bolt hole grouting. Second, product performance fluidity (mm) 24h vertical expansion ratio (%) Compressive Strength (Mpa) once grout thickness (mm) reference standard amount of water ≥300 ≥0.020 R1≥20 R3≥40 R28≥60 ≤200 12 % ~ 13% 2200Kg / ml or more data measured under standard laboratory conditions; l product details, please refer to Technical Support Applications "on cement-based grouting material technical specifications"; Third, the construction method, the pre-construction preparation: (1 ) cleaning the surface of the track basis, 24 hours prior to grouting, the surface should be fully wet track basis. 1 hour prior to grouting, the water should be dry. (2) support provided by grouting chart template, not plasma leakage. (3) In case of filling in the running plasma phenomena, should be promptly treated. 2, track clay grouting material, the process should meet the following requirements: (1) a second track clay grout, grout should be on one side, the other side until it overflows, grouting shall simultaneously from four sides. (2) filling the beginning, must be continuous, without interruption, and filling time as short as possible. (3) non-vibrated in the filling process, the available bamboo strips were pulled diversion if necessary. (4) Each grout thickness should not exceed 150mm, when the grout layer is less than 30mm should take appropriate measures to assist or to switch to other types materials. (5) Do not operate the machine vibration is transmitted to prepare equipment foundation grouting. 3, the time required for initial filling of solidification CGM clay track is about 3 to 4 hours. 4, 3 to 4 hours after debating whether to use visual and feel the initial setting, after initial solidification determined by batch knife light smooth surface, and then linen or cotton cover on the surface. 5, a day depending on the temperature, below 15 ℃, the conservation of water a day, morning and evening; 15 ℃ -35 ℃ once a day early in the evening with water conservation. 6, the solidification of the track were wet clay conservation of not less than seven days. Four storage Storage: sealed, dry, moisture, sun storage period: 6 months Packaging: 50kg / bag |
Admin>>>
You are the 19225 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Warburg Vision Construction Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 19225 visitor
Copyright © GuangDong ICP No. 10089450, Beijing Warburg Vision Construction Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility